Abu Dabous, S (2008) A decision support methodology for rehabilitation management of concrete bridges, Unpublished PhD Thesis, , Concordia University (Canada).

Al-Hussein, M (1999) An integrated information system for crane selection and utilisation, Unpublished PhD Thesis, , Concordia University (Canada).

Alshibani, A (2008) Optimizing and controlling earthmoving operations using spatial technologies, Unpublished PhD Thesis, , Concordia University (Canada).

Budawara, N (2009) Key performance indicators to measure design performance in construction, Unpublished PhD Thesis, , Concordia University (Canada).

El-Rayes, K A (1998) Optimized scheduling for repetitive construction projects, Unpublished PhD Thesis, , Concordia University (Canada).

Hammad, M M (2001) CPDICenter: Web-based virtual construction project document information center in support of claims preparation, Unpublished PhD Thesis, , Concordia University (Canada).

Hassanein, A (2003) Planning and scheduling highway construction using GIS and dynamic programming, Unpublished PhD Thesis, , Concordia University (Canada).

  • Type: Thesis
  • Keywords: duration; optimization; highway; crew productivity; learning; productivity; programming; heuristic; weather
  • ISBN/ISSN:
  • URL: https://www.proquest.com/docview/305303811
  • Abstract:
    This study presents a model to plan, schedule and control the construction of highway projects. A two-state-variable, N-stage dynamic programming procedure, in conjunction with a set of heuristic rules, is capable of generating schedules to meet a specified budget or duration restraints, and can select the optimum expediting technique to reduce project duration. The proposed model incorporates both typical (equal quantity of work in all units) and non-typical (varying quantities along highway length) repetitive activities in the optimization procedure. The proposed model accounts for the impact of practical factors, such as transverse obstructions, on crew assignment and project duration and cost. The impact of inclement weather on crew productivity is accounted for, as well as the beneficial effects of the learning curve. A relational database model is developed to store: (1) local weather conditions, (2) swell and shrinkage factors for various soil types, and (3) the available resource pool. The model supports tracking and controlling project progress utilising the earned value concept. A flexible and practical methodology is proposed to forecast project time and cost at completion, enabling the assignment of a higher weight to recent crew performance. A prototype software based on the model is developed, coded in Visual C++ (version 6. 0), employing object oriented programming. ArcView® version 3. 1 is employed as the GIS engine, and the 3-D data analysis is carried out employing ArcView® 3D Analyst. (Abstract shortened by UMI. )

Hegazy, T M (1994) Integrated bid preparation with emphases on risk assessment using neural networks, Unpublished PhD Thesis, , Concordia University (Canada).

Iliescu, S (2000) A case-based reasoning approach to the designing of building envelopes, Unpublished PhD Thesis, , Concordia University (Canada).

Jrade, A (2004) Integrated conceptual cost estimating and life cycle costing system for building projects, Unpublished PhD Thesis, , Concordia University (Canada).

Li, J (2004) Web-based integrated project control, Unpublished PhD Thesis, , Concordia University (Canada).

Marzouk, M (2002) Optimizing earthmoving operations using computer simulation, Unpublished PhD Thesis, , Concordia University (Canada).

Meniru, K C U (2005) Computer-aided conceptual building design, Unpublished PhD Thesis, , Concordia University (Canada).

Morcous, G S L (2000) Case -based reasoning for modeling bridge deterioration, Unpublished PhD Thesis, , Concordia University (Canada).

Ravi, M (1998) Knowledge-based system approach to integrated design of multistorey office buildings at the preliminary stage, Unpublished PhD Thesis, , Concordia University (Canada).

Sadeghpour, F (2004) A CAD-based model for site layout, Unpublished PhD Thesis, , Concordia University (Canada).

Shehab-Eldeen, T (2002) An automated system for detection, classification and rehabilitation of defects in sewer pipes, Unpublished PhD Thesis, , Concordia University (Canada).